Home > Exhibition > Content

Check and adjust the operation of Hot Press

1. According to the thickness and quality of the requirements of the reconstituted plank, adjust the time of the time controller appropriately (notify the process of the billet operation when necessary)

2. Check the heat conduction oil pressure and hot plate temperature, whether the pipeline has oil leakage phenomenon, pay attention to the speed of the hot plate temperature recovery;

3. Check the pressure and duration of pressurization, pressure and step-down in each stage of pressure, and adjust the relevant institutions in time;

4. Check the loading and unloading machine and push and pull stroke is appropriate, the operation is smooth;

5. Check whether the piston seals and pipelines leak oil;

6. Check the operation and coordination of the transport system of the plate.